Our projects are always near a metro station and located in emerging neighborhoods.
The finish of our condos included:
3 1/4 maple wood floors and non-engineered; li>
Porcelain tile floor for kitchen and bathroom; li>
Cabinets up to thermo ceiling with retarders; li>
Quartz countertops in the kitchen and bathroom; li>
Stainless steel undermount sink; li>
Modern overmount washbasin; li>
Chrome fitting; li>
Water outlet for the refrigerator; li>
Air conditioning in all our units; li>
Air exchanger; li>
Pre-wiring the alarm system in walls; li>
40 gallon hot water tank; li>
Electric baseboards with thermostats in each room; li>
Our concrete constructions have a concrete slab of a minimum of 8 inches on each floor and our wood constructions have an inch and a half concrete slab on each floor.